main roof

Quote a24a108e

Generated 6/11/2026, 4:38:10 PM · locked to RÜFI's current engineering standards

View proposal
Big three — confirm before you bid
Membrane
18,900 SF
189 squares
Insulation
18,000 SF
180 squares
Edge metal
0 LF
perimeter

Membrane, insulation, and edge metal are the cost drivers that win or lose the job — confirm these first. Insulation is sold by the square (100 SF): a per-SF price × 100 = the per-square price.

  • No edge metal — confirm the perimeter is captured (it's a big-three driver).
Cost summary (engine base)
Materials$49,005.00
Labor$367,200.00
Non-permit expenses$18,972.73
Base cost$435,177.73
Permits (circular)$12,799.35
Total cost$447,977.08
Contract value$639,967.25
Gross profit$191,990.17
GP %30%
Benchmarks
Cost / SF$24.89
Sell / SF$35.55
Billable rate ($/MH)$148.14
Combined rate ($/MH)$96.34
Labor hours4320
Crew size / days5 / 108
Comparative pricing

Selling price at every gross-profit margin, from this quote's own cost stack. The highlighted row is the current bid — price up or down without re-running the estimate.

GP marginSelling price$ / SFBillable $/MH
25%$127,681.41$7.09$308.41
30% · this bid$137,069.75$7.61$331.09
35%$147,948.30$8.22$357.36
40%$160,702.47$8.93$388.17
45%$175,863.08$9.77$424.79
50%$194,182.15$10.79$469.04
Materials$49,005.00
DescriptionQtyUnitUnit costTotalVarianceOverride
TPO field membrane 60-mil (mechanically attached)
show math
rule: tpo-v1.field.membrane
{
  "areaSf": 18000,
  "wasteFactor": 1.05
}
18900SF$0.85$16,065.00
Plates and fasteners
show math
rule: tpo-v1.field.fasteners
{
  "areaSf": 18000
}
18000SF$0.18$3,240.00
Polyiso insulation R-25
show math
rule: tpo-v1.install.insulation
{
  "areaSf": 18000,
  "rValue": 25,
  "costPerSfPerR": 0.066,
  "insulationType": "polyiso"
}
18000SF$1.65$29,700.00
Labor$367,200.00
DescriptionQtyUnitUnit costTotalVarianceOverride
Install field membrane (18000 SF @ 24 MH/100 SF)
show math
rule: tpo-v1.field.lay-labor
{
  "areaSf": 18000,
  "mhPer100Sf": 24
}
4320HR$85.00$367,200.00
Expenses$31,772.08
DescriptionQtyUnitUnit costTotalVarianceOverride
Freight (3% of material cost)
show math
rule: tpo-v1.expense.freight
{
  "rate": 0.03,
  "materialCost": 49005
}
1LS$1,470.15$1,470.15
Crane (building height 120 ft > 30 ft)
show math
rule: tpo-v1.expense.crane
{
  "heightFt": 120,
  "thresholdFt": 30
}
1LS$1,800.00$1,800.00
15-yr manufacturer warranty ($0.08/SF)
show math
rule: tpo-v1.expense.warranty
{
  "perSf": 0.08,
  "areaSf": 18000
}
1LS$1,440.00$1,440.00
Small tools (3% of labor cost)
show math
rule: tpo-v1.expense.small-tools
{
  "rate": 0.03,
  "laborCost": 367200
}
1LS$11,016.00$11,016.00
Sales tax on materials (6.625%)
show math
rule: tpo-v1.expense.tax
{
  "taxRate": 0.06625,
  "materialCost": 49005
}
1LS$3,246.58$3,246.58
Permits (2% of contract value, solved algebraically)
show math
rule: tpo-v1.expense.permits
{
  "baseCost": 435177.73,
  "targetGp": 0.3,
  "permitRate": 0.02,
  "contractValue": 639967.25
}
1LS$12,799.35$12,799.35